Casey has 15-years’ experience across all phases of the design and construction of custom floating dock systems, wave attenuators, and anchoring solutions. His expertise includes manufacturing supervision, marina installation, quality control, and an adeptness at technical and administrative operations, as well as contract and project management.
Casey began his career in the marina design and construction industry in 2007, assisting with the operations and construction of Waveland Marina in Hull, Massachusetts. In 2008, he contributed to the formation of Marinetek North America, while also overseeing administrative and operational duties during the design and construction of the custom concrete floating docks at
Palm Harbor Marina.
In 2010, Casey resumed his duties as an integral member of the Harbormasters design and construction team, and subsequently formed Harbormasters Mexico. Notable projects include Marina Cortez, a highly customized concrete floating marina and wave attenuator with a state-of-the-art anchoring design in La Paz, Baja California Sur; Marina Palms, in North Miami, FL; Brooklyn Navy Yard Ferry Terminal in a supervisory role for StructurMarine; and the perimeter wave attenuator at Marina Papagayo in Guanacaste, Costa Rica.